The steel structure of the reconstruction and reconstruction project of Beijing Workers Stadium, which is subcontracted by our company, is under construction. Currently, the stadium has installed a multi-layer structure top lawn maintenance system.
renderings

The "stand bowl" structure under the canopy of the new body can increase the audience's view of the game. The total steel consumption of the steel structure canopy is about 16,400 tons, of which our company has undertaken the processing and production of about 4,200 tons of steel structures, and the installation is the highest. The height is 46 meters. The canopy is endowed with 6 major functions, namely shading, lighting, water supply and drainage, snow melting, photovoltaic power generation and noise reduction.

