- Product Details for steel frame building:
| Main frame | ||
| 1 | Main steel structure
( columns and beams ) |
1 . Steel Q345 ( S355JR ) or Q235 ( S235JR ) H shape
2 . Straight cross-section or Variable cross - section |
| 2 | Sub steel structure | 1 . Material Q235 ( S235JR ) steel
2 . Bolt connections . Anti-rust painted or galvanized . 3 . Bracing :X - type or V - type or other type bracing made from angle , round pipe , etc 4 . Purlins : C or Z type : Size from C120 ~ C320 , Z100 ~ Z200 |
| Maintenance system | ||
| 3 | Roof | Sandwich panel ( PU / EPS / fiberglass / rook wool ) or Colorful steel tile |
| 4 | Wall | Sandwich panel ( PU / EPS / fiberglass / rook wool ) or Colorful steel tile |
| Doors | Steel rolling shutter or others | |
| Windows | Alu. Alloy window , or others | |
| Fitting | ||
| 7 | Edge Cover | Steel sheet 0.5mm thickness |
| 8 | Bolts | M24 , M22 , M16 embedded bolts , intensive bolts , galvanized ordinary bolts , high-strength bolts , etc |
| 9 | Others options | Day - lighting panel , Roof ventilator , Down pipe , Galvanized , Crane , sanitary Products , etc |
| 10 | Foundation | Cement and steel foundation bolts |

- About us:
As one of the good steel frame suppliers in China, our company commenced its operations in 2004, and pioneered the high-end metal building products market in China. We have been the first mover in China, right from workshops, high rise buildings, steel buildings ( made of prefabricated structures) etc to all kinds of pre-engineered buildings.
Today, we are a leading turnkey Pre-Engineered Steel building Construction Solution provider in China with integrated facilities for design, manufacture, logistics, supply and project execution capabilities for pre-engineered steel buildings. We hold a significant part of market share in Asia for metal building systems. We work in close association with industry leaders in project development and construction, providing support to critical industrial, commercial and infrastructure projects.
We are also a certified green building partner and all our products comply with international green norms.
- Project case- Qilu Petro-chemical Heavy Steel Workshop:
Size: 55000 square meter workshop, Single Span 39m, eave height 18m, mainly loading bear steel member over 100Ton, totally quantity of steel 6000Ton.
Steel Column: Q345B Four tube lattice column. Painted: 120um epoxy zinc painted.
Roof Structure: Q235B Pipe Truss Structure. Painted: 120um epoxy zinc painted.
Crane Beam: Q345B H section Steel Beam. Painted: 120um epoxy zinc painted.
Secondary Structure
Roof Horizontal Bracing: Q235B Angle Steel, Painted: three layer white color anti-rust Alkyd painted
Wall X Cross Bracing: Q235B Double Angle Steel, Painted: three layer white color anti-rust Alkyd painted
Tie Beam: Q235B Welding Pipe, Painted: three layer white color anti-rust Alkyd painted.
Roof Purlin: Galvanized C section steel
Wall Purlin: Galvanized C section steel
Steel Rod: Galvanized Steel Rod.
Panel system
Roof: 0.5mm Single Color sheet
Wall: 0.5mm Single Color sheet

- Packaging & Shipping:

- FAQ:
1) Q: How could I control the cost of building a steel building?
A: Firstly, the designing scheme should be mutually discussed and then accepted. Then, the kinds of building materials should be confirmed since different types and qualities make various prices. After that, we will send you a detailed quotation.
2) Q: How long does it take to build a steel building ( made of prefabricated structures)?
A: It depends on the size of the warehouse. Generally, the construction period of is 1 month of a 2000-square-meter workshop by a construction team of 8-10 people. It only costs 2-3 weeks to build the steel structure frame.
3) Q: Is it difficult to build a steel building?
A: totally not, you can let your local teams build it according to the construction drawings and erection guiding video provided by us.